Signs it is time to replace
Age is the first clue. Many asphalt roofs in Madison County are asked to last well past the point where the shingles still shed water. If the roof is 15 to 20 years old and you are calling about leaks more than once a season, replacement is usually the honest conversation.
Look at the surface, not just the ceiling stain. Curling or missing shingles, bald spots where granules have washed into the gutters, and soft decking underfoot all point the same direction. One cracked shingle is a repair. A field of them is a roof that has used up its life.
Widespread leaks are the other tell. Water showing up in more than one room, or coming back after a patch, usually means the underlayment and deck have been wet for a while. In New Douglas and the rest of the county, freeze-thaw winters make that worse. We will say so on the estimate instead of selling another temporary fix.
Material options
Asphalt shingles are what most homes around here already have, and they are still the practical choice for a full replacement. You pick a color, we install around vents, chimneys, and skylights, and the job is usually finished in a few days.
Metal is the other residential option we install, including standing-seam and snap-lock steel. It costs more up front and suits owners who plan to stay. Flat and low-slope sections — porches, additions, and some commercial roofs — need a different system. We will not put shingles on a roof that should be flat roofing.
The estimate names the material, the color or panel, and what is included. If part of the house wants shingles and part wants a flat system, both show up as line items so you can see the split.
What a tear-off and install involves
We pull the old shingles and underlayment down to the deck. That is the only way to see rotten plywood, popped nails, and old patches that were covered over. Debris goes onto tarps, not into the flower beds, and it leaves the property when the tear-off is done.
New underlayment goes on before shingles or panels. Valleys, eaves, and penetrations get the extra attention, because that is where replacements fail when they are rushed. Flashings are replaced where they are worn, not smeared with tar and left in place.
If you want gutters, siding, or windows done in the same visit, say so before we schedule. One crew and one estimate is simpler than three contractors stepping on each other.
Timeline, decking, clean-up, and the walkthrough
Most houses take a few days, not a few weeks. Size, the number of layers we have to pull, steep pitches, and weather all move the date. We will not start a tear-off if the forecast says the deck will sit open in a storm.
Decking repair is priced when we can see it. Soft or delaminated plywood gets replaced before the new roof goes down. We do not bury a bad deck under new shingles and hope you do not notice next spring.
Clean-up includes a magnet sweep for nails in the yard and driveway. Then we walk the job with you: ridges, flashings, and the ground. You should be able to see what you paid for.